Experience
-
PTI
assisted Iroquois Gas Transmission in 2006, 2007 and 2008
with the project definition, FERC application assistance, FEED, purchasing
and cost control set-up of their Market Access Project and their 08/09
Project. This project consisted of the
installation of two grassroots compressor stations as well as a large gas
cooler addition to a third station.
-
PTI performed
the front end engineering design, the project
engineering, assisting with project set-up and
cost control of the 2005 Tuscarora Gas
Transmission System Expansion. This project
consisted of the
design of one Solar T60 compressor station.
as the hot tapping and stoppling of the
pipeline to allow for the installation of the
compression equipment.
-
PTI performed
the front end engineering design, the system hydraulics, the project
management and cost control of the 2002 Tuscarora Gas Transmission System
Expansion. This project consisted of the grassroots design of two Solar T60
compressor stations, a 600 HP recip. booster station as well as the hot
tapping and stoppling of the pipeline to allow for the installation of the
compressor stations.
-
PTI was
selected to carry out the Preliminary facility design and feasibility
studies on the Alliance Pipeline in Canada and the USA. This pipeline was
originally conceived as a dense phase pipeline designed to transport high
liquid content natural gas. During the feasibility stage, all different
possible design variations were considered and Alliance settled on a normal
high pressure pipeline at 1740 psi. PTI selected all of the facility
locations, prepared the Design Concept Manual for the facilities, verified
the system hydraulics, researched the equipment supply, generated detailed
cost estimates, assisted in both the FERC and NEB Applications, generated
the preliminary P&ID's, generated the reliability/availability study and
prepared the gas turbine and electric motor bid specifications.
-
Worley Limited (Australia) -Provided technical input for preliminary design
and turbine specification and selection to Gas Transmission Corporation of
Melbourne, Australia. Project included the generation of preliminary
engineering package for two multi-unit Solar Centaur/Taurus compressor
stations.
-
Novacorp
International /Botas -Mechanical Design verification, construction quality
control and start-up of the USSR/Turkey Natural Gas Pipeline system. This
system included over 700 km of 36 and 24 inch pipeline, 11 large meter
stations and one 30 MW compressor station.
-
AlintaGas
(Western Australia) -Generated study comparing compressor selection options
and application of various vendor equipment to the short term expansion and
long term growth of AlintaGas�s 1600 km, nine station, 26" pipeline system.
|
|
|